Illustrative example · synthetic plant and assumptions
PV8

Wind–PV hybridisation

VISUAL SITE REFERENCE

See the land behind the infrastructure

Separate wind illustration · demonstration parcel numbers and geometry.

842/3 · DEMO · T-02842/1 · DEMO843/2 · DEMO
Generated illustration · overlays are schematic, not surveyed. Separate wind example, not SE Vranovci.

This visual reference is separate from the synthetic calculation below. Selecting a route or configuration does not change its metrics or downloads.

PV8 demonstration solar plant, FR · 4 MWp · synthetic inputs

Needs confirmation

The shared-grid energy case is calculated; measured wind, micrositing, ecology and connection studies remain open.

Wind capacity
2,4 MW
Synthetic inputs
Wind after grid constraints
7 248,9 MWh/year
Synthetic inputs
Wind curtailed by the shared limit
620,1 MWh/year
Synthetic inputs
Why

HYBRID OUTPUT CALCULATED · SITE EVIDENCE REQUIRED

Additional facts
Investment allowance
3 840 000 €
Synthetic inputs

Compare the scenario with its baseline

Δ −620,1 MWh/year

Wind before the grid constraint
7 869,0 MWh/year
Wind after the grid constraint
7 248,9 MWh/year
Wind curtailed by the shared limit
620,1 MWh/year
Why

An annual model is included in this calculation. Its tax basis and assumptions must be reviewed before use.

Modelled hybrid output does not establish a turbine position, measured wind resource or a shared-connection approval.

Report copy is presented in the selected language where available; some technical labels remain in English. Figures use the FR edition’s EUR convention.

Illustrative inputs

  • Synthetic 4 MWp plant: 16,000 modules × 250 Wp.
  • 4,400 MWh/year generation and 8 ha site area are illustrative inputs.
  • No grid import agreement, customer contract or surveyed layout is supplied.

Three next steps

  • Validate the wind resource and manufacturer power curve.
  • Review dwelling setbacks, noise, ecology and land access.
  • Confirm shared-grid and electrical interface feasibility.
CONCEPT PACKAGE · ENGINEER VERIFICATION REQUIRED

Engineering handoff package

The sample package contains a functional concept SLD built from explicit synthetic assumptions. It is editable and traceable, but it is not for construction and does not invent protection, cable, earthing or utility approvals.

  • Concept single-line diagram · PDF, SVG and editable DXF
  • Equipment, feeder, evidence and information-required schedules · XLSX and CSV
  • Design basis, saved decision brief and exact result snapshot · PDF and JSON
  • Checksummed manifest and package lineage · JSON
Download sample engineering package · ZIP
01SLD + CAD
02Schedules
03Lineage
Built for review and continuation in the customer’s engineering workflow.

Use this example to see the decision process. Your own result depends on your plant, assumptions and evidence; it is not a financing approval.

Explore this route in PV8

Micrositing

Explore turbine positions around retained PV.

Hybrid production

Compare wind and PV through the connection constraint.

Evidence and economics

Review resource quality, civil works and financial assumptions.

Calculation basis

Generated offline with PV8 engine code. No customer information or live provider response is included. Financial figures use EUR. Rebuild recipe: scripts/build_public_sample_snapshots.py.

Snapshot SHA-256: d79470d0781b431547826a2b57ff3cf30dfe16e8b4ded5d721cbc5f6375e5336

{
  "schema": "pv8.public_samples/1",
  "slug": "wind",
  "country": "FR",
  "currency": "EUR",
  "sha256": "d79470d0781b431547826a2b57ff3cf30dfe16e8b4ded5d721cbc5f6375e5336",
  "recipe_sha256": "6336621d4d7dd98e4d258b757e006f2dad71c51d6d5a7fda73afb56d034eef41",
  "engine_revision": "051b3ef7777df0004727eeb2aadfe90cea2a4b33"
}

Download the complete calculation JSON