SE Vranovci · planned project · k.o. Vranovci · parcel 1162/3 (published study).
Source: July 2026 environmental study, pp. 5 and 14 · This visual reference is separate from the synthetic calculation below. Selecting a route or configuration does not change its metrics or downloads.
The electrical uplift is modelled from a module-class assumption; confirm structures, equipment and grid conditions.
PHYSICAL FIT REQUIRES VERIFICATION
Δ 2 500 kWp
An annual model is included in this calculation. Its tax basis and assumptions must be reviewed before use.
A DC nameplate uplift does not establish structural fit, AC capacity or permission to change the supported plant.
Report copy is presented in the selected language where available; some technical labels remain in English. Figures use the FR edition’s EUR convention.
The sample package contains a functional concept SLD built from explicit synthetic assumptions. It is editable and traceable, but it is not for construction and does not invent protection, cable, earthing or utility approvals.
Use this example to see the decision process. Your own result depends on your plant, assumptions and evidence; it is not a financing approval.
Compare replacement modules with the existing arrangement.
Include downtime and the existing production baseline.
Connect removed equipment and recycling assumptions to the investment case.
Generated offline with PV8 engine code. No customer information or live provider response is included. Financial figures use EUR. Rebuild recipe: scripts/build_public_sample_snapshots.py.
Snapshot SHA-256: 851f8afcac59e4305d37bbcbcb3d67515277e76629831a01674f6fc3aeb2abfa
{
"schema": "pv8.public_samples/1",
"slug": "repowering",
"country": "FR",
"currency": "EUR",
"sha256": "851f8afcac59e4305d37bbcbcb3d67515277e76629831a01674f6fc3aeb2abfa",
"recipe_sha256": "6336621d4d7dd98e4d258b757e006f2dad71c51d6d5a7fda73afb56d034eef41",
"engine_revision": "585818885f76d181dafab27328bf49f574a465bd"
}