Illustrative example · synthetic plant and assumptions
PV8

Land value and leasing

PV8 demonstration solar plant, FR · 4 MWp · synthetic inputs

Needs confirmation

The lease threshold is a screening result, not a valuation or permission to remove operating PV.

Selected area
10 000 m²
Synthetic inputs
Illustrative annual lease
2 000 € / year
Synthetic inputs
Lease term
20 years
Synthetic inputs
Why

MARKET OFFER REQUIRED

Compare the scenario with its baseline

Lease under the scenario
2 000 € / year
Why

An annual model is included in this calculation. Its tax basis and assumptions must be reviewed before use.

An illustrative rent is neither a market offer nor permission to remove PV, split a parcel or grant access.

Report copy is presented in the selected language where available; some technical labels remain in English. Figures use the FR edition’s EUR convention.

Illustrative inputs

  • Synthetic 4 MWp plant: 16,000 modules × 250 Wp.
  • 4,400 MWh/year generation and 8 ha site area are illustrative inputs.
  • No grid import agreement, customer contract or surveyed layout is supplied.

Three next steps

  • Verify parcel rights, lender restrictions and access.
  • Record a dated local valuation or counterparty offer.
  • Account for displaced PV and any reinstatement obligations.
SCREENING EVIDENCE PACKAGE · NO SLD

Engineering handoff package

An electrical SLD would not describe this route. PV8 hands over its decision basis and evidence requests; the customer keeps the JSON snapshot and can carry verified site data into its normal land, planning or grid workflow.

  • Parcel and rights evidence schedule
  • Lease assumptions and lost-generation basis
  • Calculation snapshot JSON and checksum
Download the screening evidence · JSON
01Evidence
02Schedules
03Lineage
Built for review and continuation in the customer’s engineering workflow.

Use this example to see the decision process. Your own result depends on your plant, assumptions and evidence; it is not a financing approval.

Explore this route in PV8

Parcel selection

Compare the proposed use with retained PV.

Lease structure

Review option periods, escalation and the lease term.

Evidence

Keep market benchmarks separate from signed offers.

Calculation basis

Generated offline with PV8 engine code. No customer information or live provider response is included. Financial figures use EUR. Rebuild recipe: scripts/build_public_sample_snapshots.py.

Snapshot SHA-256: 2aaa7b2c78ba48a085f7ac4fde2721bf666b685163f8d5f271606d9e8779e828

{
  "schema": "pv8.public_samples/1",
  "slug": "land",
  "country": "FR",
  "currency": "EUR",
  "sha256": "2aaa7b2c78ba48a085f7ac4fde2721bf666b685163f8d5f271606d9e8779e828",
  "recipe_sha256": "6336621d4d7dd98e4d258b757e006f2dad71c51d6d5a7fda73afb56d034eef41",
  "engine_revision": "72dd52fcb5e8ade19adb205ee3e46a139cc349fa"
}

Download the complete calculation JSON